- Cutting joints in the fresh concrete
- More construction joints
- The master at work, cutting joints in the concrete
- Setting the detectable warning tile
- Cleaning up around the detectable warning tile
- Finishing around a warning strip
- Finishing the sidewalk at the Oncenter
- Cutting the joints in the concrete. These joints give the concrete a place to crack (if it happens to move)
- Cutting the joint
- Edging along the wall
- Edging along the wall
- Finishing the sidewalk
- 1 year after being poured the sidewalk is holding up great.
- Picture was taken a year later, this is where the Zamboni empties and there was concern of wear, still looking good.
- A seasoned sidewalk we poured at the Oncenter